Wednesday 8 May 2013

The Uhuru Highway Viaduct Mega Project!


The Overall objective of the project is to relieve the traffic congestion currently prevalent along road A104 and raise the running speed at which traffic passes through Nairobi. A uniform running speed of 80km/h is anticipated for through traffic using the Uhuru Viaduct.
 

To achieve this objective, all major side road intersections will be replaced by grade separated interchages and all medium U-turnd will be removed.
As noted in DP9 (Road Network and Property Access) service roads are viewed as being contrary to the project objectives because they detract from the capacity and safety of operation of any such facility. However, where service roads exist they will be retained. Similarly, no direct access to the road from individual properties should be allowed, for the same reasons.

We are currently working on the detailed designs of the interchanges, elevated highway and bridges along the viaduct..
 
 


The Following Pictures show both Existing Junctions and Roundabouts and how they will be eliminated in the Proposed New Designs:
1. Likoni Road Junction

 2. University Way Roundabout

 
 
 3. Museum Hill Interchange



4. Riverside Drive Juction



5. Rhapta Rd. (Westlands Round About)


6. Parklands Road



7. BrookSide Junction


8. James Gichure Rd. Junction



9. Kapiti-Popo Rd Junction


10. Kiganjo Avenue Juctions

 11. Melili Rd Junction

 12. Nyayo Roundabout (3 Level Interchange Proposed)

 13. Bunyala Road Roundabout

 14. Haile Sellasie Roundabout

 15. Harambee Avenue

 16. Kenyatta Avenue


 